THERMAX WASTE HEAT RECOVERY SOLUTION

Unlock ₹40 Lakhs–

₹2 Crore in Annual Fuel Savings from Your Sulphonation Plant’s Waste Heat

Convert waste heat from your sulphonation process into valuable process steam and reduce boiler fuel costs, without changing your existing production process.

🌡️
200–400°C Waste
Heat Available
💰
Up to 60% Fuel Savings
⏳
1–2 Year Payback
🏭
No Process Modifications

Calculate Your Savings Potential

Share a few details and our experts will get in touch.

Error: Contact form not found.

✅ No Cost

✅ No Obligation

✅ Expert Evaluation

₹159 Cr+
WHR projects delivered last year
10+
Industries served
60+ Yrs
Energy expertise
2–3 Yrs
Typical payback
Custom Engineered
Designed around your process.
Dedicated Lifecycle Support
Service beyond commissioning.
IS YOUR PLANT A GOOD FIT?

Recover More Than Just Heat

If your plant has these conditions, it's an ideal candidate for Waste Heat Recovery.

✓
Continuous Plant Operations
✓
Existing Fuel-Fired Boiler / Hot Water Generator / Thermic Fluid Heater
✓
Steam / Hot Water / Thermic Fluid Requirement
✓
200–400°C Waste Heat Source
WHERE YOUR WASTE HEAT COMES FROM

Your Process Already Generates Valuable Heat

Sulphur Burner
➜
SO₂ Converter
➜
Ambient Air
➜
SO₃ Cooling
➜
Final Product
➜
Waste Heat Available
➜
Thermax WHRB
➜
Usable Process Steam

Recover heat that's already available and reduce your boiler fuel consumption.

WASTE HEAT RECOVERY SOLUTIONS

Complete Waste Heat Recovery Solutions

🔥

Waste Heat Recovery Boiler

Generate process steam

🌀

Waste Heat Gas Preheater

Recover high-temperature process heat

♻️

Hot Water Generator

Generate process hot water

🛠️

Turnkey Project Delivery

Engineering to commissioning

WHY RECOVER WASTE HEAT?

Stop Paying Twice for Steam


Your process already generates valuable heat. Your boiler burns fuel to generate steam.

Thermax converts that wasted heat into usable process steam, reducing fuel costs while improving plant efficiency.

💵

Lower Fuel Costs

Save up to 60% on boiler fuel.

⚙️

Improve Efficiency

Recover high-temperature process heat

🌿

Support Sustainability

Lower emissions and improve energy efficiency.

PROVEN RESULTS
Proven Savings in a Real Sulphonation Plant
Surfactant Plant, Gurugram
BEFORE
Equipment Diesel Boiler
Fuel use 35 L/hr Diesel
Fuel spend ₹2.5 Cr / year
Status High fuel dependency
AFTER — WITH THERMAX WHRB
Equipment Thermax WHRB
Steam output 0.5 TPH
Annual savings ₹90 Lakh
Payback < 1 year

Zero process modifications. Significant long-term savings.

SAVINGS CALCULATOR

Estimate Your Plant's Fuel Savings

Enter your equipment and fuel details to get an instant, indicative estimate of potential savings.

Calculated automatically based on selected fuel type — no input needed.

Indicative Results
Heat duty required —
Current fuel consumption —
Current monthly fuel cost —
Estimated Annual Savings —
Estimated payback period —

This is an indicative, non-binding estimate based on standard fuel calorific values and typical system efficiencies. Request a free assessment for a site-specific engineering evaluation.

© Thermax Limited. All Rights Reserved.vbvbvb