Unlock
₹40 Lakhs–
₹2 Crore
in Annual Fuel Savings from Your Sulphonation Plant’s Waste Heat
Convert waste heat from your sulphonation process into valuable process steam and reduce boiler fuel costs, without changing your existing production process.
🌡️
200–400°C Waste
Heat Available
💰
Up to 60% Fuel Savings
⏳
2–3 Year Payback
🏭
No Process Modifications
Calculate Your Savings Potential
Share a few details and our experts will get in touch.
Error: Contact form not found.
✅ No Cost
✅ No Obligation
✅ Expert Evaluation
₹159 Cr+
WHR projects delivered last year
10+
Industries served
60+ Yrs
Energy expertise
2–3 Yrs
Typical payback
Custom Engineered
Designed around your process.
Dedicated Lifecycle Support
Service beyond commissioning.
IS YOUR PLANT A GOOD FIT?
Recover More Than Just Heat
If your plant has these conditions, it's an ideal candidate for Waste Heat Recovery.
✓
Continuous Plant Operations
✓
Existing Fuel-Fired Boiler / Hot Water Generator / Thermic Fluid Heater
✓
Steam / Hot Water / Thermic Fluid Requirement
✓
200–400°C Waste Heat Source
WHERE YOUR WASTE HEAT COMES FROM
Your Process Already Generates Valuable Heat
Sulphur Burner
➜
SO₂ Converter
➜
Ambient Air
➜
SO₃ Cooling
➜
Final Product
➜
Waste Heat Available
➜
Thermax WHRB
➜
Usable Process Steam
Recover heat that's already available and reduce your boiler fuel consumption.
WASTE HEAT RECOVERY SOLUTIONS
Complete Waste Heat Recovery Solutions
🔥
Waste Heat Recovery Boiler
Generate process steam
🌀
Waste Heat Gas Preheater
Recover high-temperature process heat
♻️
Hot Water Generator
Generate process hot water
🛠️
Turnkey Project Delivery
Engineering to commissioning
WHY RECOVER WASTE HEAT?
Stop Paying Twice for Steam
Your process already generates valuable heat. Your boiler burns fuel to generate steam.
Thermax converts that wasted heat into usable process steam, reducing fuel costs while improving plant efficiency.
💵
Lower Fuel Costs
Save up to 60% on boiler fuel.
⚙️
Improve Efficiency
Recover high-temperature process heat
🌿
Support Sustainability
Lower emissions and improve energy efficiency.
PROVEN RESULTS
Proven Savings in a Real Sulphonation Plant
Surfactant Plant, Gurugram
BEFORE
BoilerRXD 850
Annual diesel expenditure₹2.5 Cr+
StatusHigh fuel dependency
AFTER — WITH THERMAX WHRB
Boiler0.5 TPH Thermax WHRB
Annual savings₹90 Lakhs
ImpactLower operating cost
Zero process modifications. Significant long-term savings.
SAVINGS CALCULATOR
Estimate Your Plant's Fuel Savings
Enter your equipment and fuel details to get an instant, indicative estimate
of
potential savings.
Calculated automatically based on selected fuel type — no input needed.
Indicative Results
Estimated Annual Savings
—
Estimated payback period
2–3 Years
This is an indicative, non-binding estimate based on standard fuel calorific values and typical system efficiencies. Request a free assessment for a site-specific engineering evaluation.